Saniter Terrace

ARCHITECTS' FAVORITE

This building appeals to architects with its flat roof and multiple cladding options.

Modular and customizable, it integrates perfectly into urban and landscape projects.

  • Width: 2.40 m / Length: 4.06 m
  • Height excluding chimney: 2.46 m
  • Base structure: Class 3 structure, Class 4 envelope
  • Building: 3-ply spruce wood panel
  • Cladding: Spruce, Class 3; vertical or horizontal
  • Roof: Steel sheet, RAL 7022
  • Cabin: White HPL cladding
  • Flooring: Marmoleum, heavy-traffic floor covering
  • Natural lighting: Flush glazing on both side walls
  • Storage cabinet
  • Stainless steel (INOX) door reinforcement
  • Support bar

A 100% comfort cabin

Les cabines Sanisphere offrent une expérience de confort optimal, pensée pour les usagers comme pour les exploitants.

Conçues avec des matériaux de qualité, elles garantissent un environnement propre, accueillant et hygiénique. Sobres, modernes et épurées, nos cabines sont adaptées aux conditions d’accessibilité pour les personnes en situation de handicap.

Une signalétique simple basée sur des pictogrammes permet d’en comprendre le fonctionnement en un instant.

Une cabine 100% hygiénique

Chaque cabine Sanisphere est équipée d’un distributeur de gel hydroalcoolique et de papier hygiénique pour assurer l’hygiène. Les portes-manteaux, la signalétique intérieure et extérieure complètent l’équipement.

  • Hand sanitizer dispenser
  • Toilet paper dispenser
  • Coat hooks
  • Interior and exterior signage
  • Option: wall hook (reinforced coat hook)
  • Option: educational panel
  • Electrical supply: photovoltaic panels or grid connection
  • Lighting: recessed low-consumption anti-vandal spotlight
  • Twilight presence detector
  • Door opening: right or left
  • Programmable locking system
  • Cabin / urinal threshold channel
  • Baby changing table
  • Double urinal, side or rear
  • Manual pedal operation (PRM)
  • Cladding: Chestnut, Douglas fir, HPL, Larch, ready for cladding
  • Flooring: Aluminium checker plate
  • Roof: Steel sheet – custom RAL, green roof, EPDM
  • Eco-tourism: Faux board-and-batten cladding, door frames in steel sheet RAL 7022
  • Eco-park: HPL (color palette choice) + vertical or horizontal faux board-and-batten cladding
  • Double screen: standard cladding + double faux board-and-batten screen
  • Large cities
  • Urban areas
  • Urban parks
  • Playgrounds
  • Leisure bases
  • Multi-sport parks
  • Cycle routes
  • Tourist sites
  • Coastal areas and beaches
  • Architectural projects
  • Rest areas
  • Zoos

WHY CHOOSE SANITER TERRACE?



The architects’ favorite

Toilets that appeal to design professionals

Le SANITER TERRASSE séduit les architectes avec son toit terrasse et ses multiples options de bardage. Modulable et personnalisable, il s'intègre parfaitement dans les projets urbains et paysagers contemporains. Conçu pour les parcs, jardins et sites classés, il s'intègre harmonieusement dans son environnement tout en répondant aux enjeux esthétiques et architecturaux les plus exigeants. Structure classe 3, enveloppe classe 4 pour une durabilité exceptionnelle. Toiture terrasse plate offrant une silhouette épurée et moderne.



Suitable for architectural and landscape projects

Toilets for all urban and natural contexts

SANITER TERRACE can be installed in all contexts: large cities, urban areas, urban parks, playgrounds, leisure bases, multi-sport parks, cycle routes, tourist sites, coastal areas and beaches, architectural projects, zoos, and rest areas. Available in a double-cabin version including one with PRM accessibility, or a non-PRM double-cabin version. Spacious cabin with white HPL cladding, natural lighting with flush glazing, storage cabinet, and support bar. Fast installation in 1 day by a team of specialized technicians.



Numerous options to match your project

Numerous options to match your project

SANITER TERRACE offers great flexibility with its numerous options and finishes. Various cladding options (spruce, chestnut, douglas fir, larch, HPL, faux board-and-batten), customizable roofs (steel sheet with RAL finish, green roof, EPDM). Eco-tourism and eco-park options available. Optional side or rear urinals. Optional baby changing table. Double faux board-and-batten screen possible. Electrical supply via photovoltaic panels or grid connection. Programmable locking system, anti-vandal lighting with twilight sensor. 2-year warranty including preventive maintenance and in-house after-sales service. Design office for project coordination.

environment of installation

And also Related Models.

They trust us

More than 1,400 Sanisphere installations currently equip communities, natural parks, refuges, ski resorts, and motorway rest areas across France and Europe.

Frequently Asked Questions about our public dry toilets

How long does the preparatory phase last?
The preparatory phase generally lasts 4 to 8 weeks depending on the complexity of your project. This duration varies based on:
• The complexity of your existing building
• Regulatory and environmental constraints (ABF, ERP, protected areas)
• The number of exchanges with your project management and client teams
• The availability of all project stakeholders
• Any requested modifications or adjustments
For simple projects, we also offer a simplified pre-study that accelerates the decision-making process.
The complete installation generally takes 1 day. Our specialized technicians master the process and work efficiently to minimize disruption on your site.

This speed is possible thanks to:

• Our 30 years of expertise
• Our mastered installation processes
• Our teams of specialized technicians
• The modularity of our integrated toilet kit
• Complete preparation during the preparatory phase

The construction phase includes 3 main steps:

1. Logistics Organization
Once the order is confirmed, our team contacts you and your service providers to organize the construction site.

2. Mobilization of the Installation Team
Our SANISPHERE team actively participates in the smooth running of the construction site.

3. Delivery of the Prefabricated Building
The building can be delivered on a low-loader trailer, by 4×4, truck, boat, or helicopter, depending on site access conditions.

The construction phase includes 5 main steps: 1. Earthworks
Generally completed in a single day, these works are entrusted by you to a local Public Works company (SANISPHERE can also take charge).

2. Installation of Ancillary Materials
Our team supplies and installs all these materials (DELTA MS, stainless steel mesh, manholes, etc.).

3. Crating of the Building
Our buildings are prefabricated in the factory; they can be lifted using an excavator, telehandler, crane, or airlifted by helicopter.

4. Urine Management
We offer several solutions for effluent management: connection to the network, storage tanks, decantation tank + spreading drain.

5. Commissioning
As soon as the work is finished, SANISPHERE toilets are immediately usable! You are free to carry out the finishes around the building (lawn, concrete slab, asphalt, etc.).

We offer two ventilation solutions:
Natural ventilation (standard):
• Zero electricity
• Zero operating costs
• Based on 3 natural forces: chimney effect, atmospheric pressure difference, thermal inertia
• Works in all conditions, even extreme ones
• Completely eliminates odors
Electric ventilation (option):
• For sites requiring assisted ventilation
• Can be powered by photovoltaic panels or the electrical grid
• Ensures optimal ventilation in all conditions
During the preparatory phase, we analyze your site to recommend the best solution.

Tell us about your project

Our experts support you in the design, installation, and maintenance of your ecological sanitary solution.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.